SlovSEFF III projects

Blue portfolio Industrial energy efficiency             
Green portfolio  Renewable energy            
Yellow portfolio Residential energy efficiency

 

 

SlovSEFF III achievements

EN 2017 05 27

 

PROJECT DESCRIPTION
SLOVSEFF LOAN (€) GHG SAVINGS (tCO2e/a) ENERGY SAVINGS (MWh/a) CARBON     REDUCTION       COMPENSATION (€)

FACT SHEET

Circuit THK and Šalgotarjánska

Replacement of old and poorly insulated heat distribution pipes in the “THK” and Šalgotarjánska” branches with new preinsulated pipes with lower heat loss.

588,041.16 117 1,061.00 29,402.06 download icon 1

Circuit Jahodníky

Installation of new CHEs and installation of new double pipe heat distribution system.

780,200.00 343 687.00 39,010.00 download icon 1

Circuit OST Centrum + Circuit Balkán + Circuit Namestie Slobody

Replacement of old and poorly insulated heat distribution pipes in “Balkán” and “OST Centrum” branches of CHS with new pre-insulated pipes with lower heat loss.
306,227.58  192 949.60  15,311.38 download icon 1

Circuit Kukučínova + Farkaška-Francisciho

Replacement of old, poorly insulated pipes of the “PK Farkaška” and “OST Kukučínova” circuits with new preinsulated pipes with lower heat loss.
242,206.67 104 521.50 12,110.33 download icon 1

South circuitKrupina

Replacement of old, poorly insulated heat distribution pipes of the south branch of the CHS with new preinsulated pipes with lower heat loss.
112,431.13 34 167.00 5,621.56 download icon 1

Circuit Venevská - Velký Krtíš

Boiler room reconstruction and replacement of old, poorly insulated heat distribution pipes of the CHS with new preinsulated pipes with lower heat loss.
258,297.76 92 662.00 12,914.89 download icon 1

Circuit Pliešovce

Replacement of old poorly insulated heat distribution pipes in the north branch of CHS with new preinsulated pipes with lower heat loss and boiler room reconstruction.
92,429.00 30

149.00

4,621.45 download icon 1

Slovenská Ľupča circuit

Reduction of energy intensity of the heat production and distribution as well as the reduction of the consumption of natural gas, fuel oil and lignite, which were used to produce heat.
50,000.00 64 207.79 3,620.62 download icon 1

Printing machine replacement

Reduction of energy intensity in printing company by replacing an old printing machine by a new one with larger printing capacity, higher printing speed and lower energy consumption.

2,260,000.00 204 771.00 113,000.00 download icon 1

Construction of boilers rooms

Reduction of natural gas consumption by installing six new high efficiency boilers.
261,401.02 152 750.60 13,070.05 download icon 1

ŽSR Eastern boiler houses

Replacement of heat sources in east area rail stations.

451,500.00 535 1,245.43 31,988.04 download icon 1

ŽSR Central boiler houses

Replacement of heat sources in central area rail stations.
532,000.00 574 951.45 33,527.22 download icon 1

Aquapark and wellness centre Púchov

Installation of PV solar power plant.

138,000.00 34 116.62 6,900.00 download icon 1

ŽSR Western boiler houses

Replacement of heat sources in western area rail stations.
398,000.00 199 648.60 19,986.60 download icon 1

Renovation of production building in Hnúšťa

The project has done some alterations of the building construction for the purpose of new technology such as: building envelope renovation, construction of a new boiler room and related heating system renovation, electricity wiring and lighting renovation and ventilation equipment installation.

894,000.00 112 761.00 44,700.00 download icon 1

Replacement of original windows and building thermal insulation

The project has replaced the thermal envelope and the original windows of 4 buildings: Spa house "Milan", the building "Balneoterapia", Catering establishment and Connection corridor.
340,000.00 117 590.05 17,000.00 download icon 1

Heat distribution pipes replacement – Revúca “Sever 2"

The project has replaced 3,356 meters of the old, poorly insulated heat distribution pipes with the new pre-insulated pipes with lower heat losses. In total 2,752 (2 x 1,376 m) meters of new pre-insulated pipes were used reducing 459 MWh/year of heat losses.

570,841.00 346 458.00 28,542.05 download icon 1

Replacement of heat sources and distribution pipelines in Banská Bystrica

The project has improved the efficiency of heat production and deliver by the creation a new connection of apartment buildings in Uhlisko by the reconstruction of natural gas boilers house at Uhlisko, at Diecézne centrum and at Wolkerova, the reconstruction of "Horná" circuit and the reconstruction of pipelines in Podháj and in Estate Heat Exchanger Station.
900,000.00 379 2,152.00 45,000.00 download icon 1

Gas boilers replacement in elementary school and in NURCH

The project has replaced the old gas boilers with new condensing boilers in the Elementary school in Trhová Hradská and in the National Institute of Rheumatological Diseases (NURCH) in Piešťany. The new condensing boilers achieve higher energy efficiency and better regulation.

270,500.00 83 423.60 13,525.00 download icon 1

Gas boilers replacement in the school Dr. Milana Hodžu

The project has replaced the old gas boilers with new condensing boilers in the Elementary school Dr.Milana Hodžu, in Bratislava. The new condensing boilers achieve higher energy efficiency and better regulation.
50,000.00 12 62.00 2,500.00 download icon 1

Improvement of insulation and windows in Liptovský Mikuláš

The project has improved basement ceiling insulation, external walls insulation, ceiling of unheated attic insulation and it has replaced both original and staircase windows.

34,525.00 2 13.89 5,179.00 download icon 1

Improvement of insulation, windows and HVAC in Liptovský Mikuláš

The project has improved external walls insulation, it has replaced original windows and it has improved the hydraulic regulation of the internal distribution of the existing heating system.
100,000.00 34 173.67 15,000.00 download icon 1

Reconstruction of quenching furnaces, cooling and reconstruction of lighting in the production hall

The project involves the reconstruction of quenching furnaces improving energy performance as well as reducing maintenance costs. It also has replaced the original lights in the production hall with 114 new LED lights, saving more energy.

176,260.00 114 416.72 8,813.00 download icon 1

Replacement of lighting in the N002 production / reconstruction hall in ŽOS Trnava

The project has installed  completely new lighting system utilising LED-based light sources in the N002 hall, which will bring significant electricity savings as well as compliance with hygiene standards regarding lighting intensity. Furthermore, the whole lighting has intelligent control implemented, adjusting optimal lighting intensity according to the levels of natural ambient light, achieving further savings.
582,136.00 221 755.50 29,106.80 download icon 1

Reconstruction of the heat sources with heat pumps, SPA Vyšné Ružbachy

The project has replaced old gas boilers with new heat pumps that use the geothermal spring available on site, in three different zones of the Spa Vyšné Ružbachy (Swiss Houses, Balneoterapia and The Grand Hotel Strand).

303,893.00 302 1,769.55 17,078.84 download icon 1

New heat source (biomass) and replacement of underground heat delivery pipes

The project has replaced the old poor-insulated heat distribution pipe of CHS by new preinsulated pipes with low heat loss and it has made a reconstruction in the boiler room, replacing the old natural gas boilers with new biomass boilers. installed  completely new lighting system utilising LED-based light sources in the N002 hall, which will bring significant electricity savings as well as compliance with hygiene standards regarding lighting intensity. Furthermore, the whole lighting has intelligent control implemented, adjusting optimal lighting intensity according to the levels of natural ambient light, achieving further savings.
1,5000,000.00

2,422

1,393.00 137,017.93 download icon 1
TOTAL 12,192,889.32 6,818 17,857.55   704,546.82