SlovSEFF III projects


Blue portfolio Industrial energy efficiency             
Green portfolio  Renewable energy            
Yellow portfolio Residential energy efficiency

 

 

SlovSEFF III achievements


EN 2019 10 03

 

PROJECT DESCRIPTION
SLOVSEFF LOAN (€) GHG SAVINGS (tCO2e/a) ENERGY SAVINGS (MWh/a) CARBON     REDUCTION       COMPENSATION (€)

FACT SHEET

Circuit THK and Šalgotarjánska

Replacement of old and poorly insulated heat distribution pipes in the “THK” and Šalgotarjánska” branches with new preinsulated pipes with lower heat loss.

588,041.16 117 1,061.00 29,402.06 download icon 1

Circuit Jahodníky

Installation of new CHEs and installation of new double pipe heat distribution system.

780,200.00 343 687.00 39,010.00 download icon 1

Circuit OST Centrum + Circuit Balkán + Circuit Namestie Slobody

Replacement of old and poorly insulated heat distribution pipes in “Balkán” and “OST Centrum” branches of CHS with new pre-insulated pipes with lower heat loss.
306,227.58  192 949.60  15,311.38 download icon 1

Circuit Kukučínova + Farkaška-Francisciho

Replacement of old, poorly insulated pipes of the “PK Farkaška” and “OST Kukučínova” circuits with new preinsulated pipes with lower heat loss.
242,206.67 104 521.50 12,110.33 download icon 1

South circuitKrupina

Replacement of old, poorly insulated heat distribution pipes of the south branch of the CHS with new preinsulated pipes with lower heat loss.
112,431.13 34 167.00 5,621.56 download icon 1

Circuit Venevská - Velký Krtíš

Boiler room reconstruction and replacement of old, poorly insulated heat distribution pipes of the CHS with new preinsulated pipes with lower heat loss.
258,297.76 92 662.00 12,914.89 download icon 1

Circuit Pliešovce

Replacement of old poorly insulated heat distribution pipes in the north branch of CHS with new preinsulated pipes with lower heat loss and boiler room reconstruction.
92,429.00 30

149.00

4,621.45 download icon 1

Slovenská Ľupča circuit

Reduction of energy intensity of the heat production and distribution as well as the reduction of the consumption of natural gas, fuel oil and lignite, which were used to produce heat.
50,000.00 64 207.79 3,620.62 download icon 1

Printing machine replacement

Reduction of energy intensity in printing company by replacing an old printing machine by a new one with larger printing capacity, higher printing speed and lower energy consumption.

2,260,000.00 204 771.00 113,000.00 download icon 1

Construction of boilers rooms

Reduction of natural gas consumption by installing six new high efficiency boilers.
261,401.02 152 750.60 13,070.05 download icon 1

ŽSR Eastern boiler houses

Replacement of heat sources in east area rail stations.

451,500.00 535 1,245.43 31,988.04 download icon 1

ŽSR Central boiler houses

Replacement of heat sources in central area rail stations.
532,000.00 574 951.45 33,527.22 download icon 1

Aquapark and wellness centre Púchov

Installation of PV solar power plant.

138,000.00 34 116.62 6,900.00 download icon 1

ŽSR Western boiler houses

Replacement of heat sources in western area rail stations.
398,000.00 199 648.60 19,986.60 download icon 1

Renovation of production building in Hnúšťa

The project has done some alterations of the building construction for the purpose of new technology such as: building envelope renovation, construction of a new boiler room and related heating system renovation, electricity wiring and lighting renovation and ventilation equipment installation.

894,000.00 112 761.00 44,700.00 download icon 1

Replacement of original windows and building thermal insulation

The project has replaced the thermal envelope and the original windows of 4 buildings: Spa house "Milan", the building "Balneoterapia", Catering establishment and Connection corridor.
340,000.00 117 590.05 17,000.00 download icon 1

Heat distribution pipes replacement – Revúca “Sever 2"

The project has replaced 3,356 meters of the old, poorly insulated heat distribution pipes with the new pre-insulated pipes with lower heat losses. In total 2,752 (2 x 1,376 m) meters of new pre-insulated pipes were used reducing 459 MWh/year of heat losses.

570,841.00 346 458.00 28,542.05 download icon 1

Replacement of heat sources and distribution pipelines in Banská Bystrica

The project has improved the efficiency of heat production and deliver by the creation a new connection of apartment buildings in Uhlisko by the reconstruction of natural gas boilers house at Uhlisko, at Diecézne centrum and at Wolkerova, the reconstruction of "Horná" circuit and the reconstruction of pipelines in Podháj and in Estate Heat Exchanger Station.
900,000.00 379 2,152.00 45,000.00 download icon 1

Gas boilers replacement in elementary school and in NURCH

The project has replaced the old gas boilers with new condensing boilers in the Elementary school in Trhová Hradská and in the National Institute of Rheumatological Diseases (NURCH) in Piešťany. The new condensing boilers achieve higher energy efficiency and better regulation.

270,500.00 83 423.60 13,525.00 download icon 1

Gas boilers replacement in the school Dr. Milana Hodžu

The project has replaced the old gas boilers with new condensing boilers in the Elementary school Dr.Milana Hodžu, in Bratislava. The new condensing boilers achieve higher energy efficiency and better regulation.
50,000.00 12 62.00 2,500.00 download icon 1

Improvement of insulation and windows in Liptovský Mikuláš

The project has improved basement ceiling insulation, external walls insulation, ceiling of unheated attic insulation and it has replaced both original and staircase windows.

34,525.00 2 13.89 5,179.00 download icon 1

Improvement of insulation, windows and HVAC in Liptovský Mikuláš

The project has improved external walls insulation, it has replaced original windows and it has improved the hydraulic regulation of the internal distribution of the existing heating system.
100,000.00 34 173.67 15,000.00 download icon 1

Reconstruction of quenching furnaces, cooling and reconstruction of lighting in the production hall

The project involves the reconstruction of quenching furnaces improving energy performance as well as reducing maintenance costs. It also has replaced the original lights in the production hall with 114 new LED lights, saving more energy.

176,260.00 114 416.72 8,813.00 download icon 1

Replacement of lighting in the N002 production / reconstruction hall in ŽOS Trnava

The project has installed  completely new lighting system utilising LED-based light sources in the N002 hall, which will bring significant electricity savings as well as compliance with hygiene standards regarding lighting intensity. Furthermore, the whole lighting has intelligent control implemented, adjusting optimal lighting intensity according to the levels of natural ambient light, achieving further savings.
582,136.00 221 755.50 29,106.80 download icon 1

Reconstruction of the heat sources with heat pumps, SPA Vyšné Ružbachy

The project has replaced old gas boilers with new heat pumps that use the geothermal spring available on site, in three different zones of the Spa Vyšné Ružbachy (Swiss Houses, Balneoterapia and The Grand Hotel Strand).

303,893.00 302 1,769.55 17,078.84 download icon 1

New heat source (biomass) and replacement of underground heat delivery pipes

The project has replaced the old poor-insulated heat distribution pipe of CHS by new preinsulated pipes with low heat loss and it has made a reconstruction in the boiler room, replacing the old natural gas boilers with new biomass boilers. installed  completely new lighting system utilising LED-based light sources in the N002 hall, which will bring significant electricity savings as well as compliance with hygiene standards regarding lighting intensity. Furthermore, the whole lighting has intelligent control implemented, adjusting optimal lighting intensity according to the levels of natural ambient light, achieving further savings.
1,500,000.00

2,422

1,393.00 137,017.93 download icon 1

Biomass DH project in Medzilaborce

The project has installed a new biomass boiler house and it has improved the heating system by installing Compact Heat Exchanger Stations (CHES) in buildings.

1,600,000.00 1,520 -613.70 85,989.79 download icon 1

Improvement of insulation, windows and balancing the heating system in Liptovský Mikuláš

The project has improved basement ceiling insulation, insulation cladding, flat roof insulation replaced original metal windows and balanced heating system in a residential building.
62,253.00 15 57.01 9,337.95 download icon 1

Replacement of diesel trucks with diesel/LPG engine trucks

The project has replaced 8 truck tractors having diesel engine, with new units, having combined fuel engines (diesel and Liquefied Petroleum Gas - LPG) meeting EURO VI emission standard. The new trucks have lower overall average fuel consumption and these vehicles are operated in mixed mode (28% LPG and 72% diesel).

611,280.00 68 134.79 30,564.00 download icon 1

Improvement of a residential building in Veterná Poruba

The project has improved basement ceiling insulation and external wall insulation in a residential building, saving pieces of wood and electricity.
42,300.00 1 26.81 6,345.00 download icon 1

Replacement of heat sources in residential houses and in social services home

The project has replaced heat sources to improve heat production systems in two residential houses and in a social services home. The project replaced the old natural gas boilers with new natural gas boilers with higher efficiency.

200,000.00 13 72.92 10,000.00 download icon 1

Replacement of heat sources in Banská Bystrica

The project has replaced heat sources to improve heat production systems in two sport centers buildings in DUKLA, in one office building in Bratislava. The project replaced the old natural gas boilers with new natural gas boilers with higher efficiency.
368,000.00 49 248.77 18,400.00 download icon 1

Improvement of a residential building in Pod Slivskou

The project has improved basement ceiling insulation, exterior wall insulation, loggia insulation and balanced heating system in a residential building.

350,000.00 58 210.57 52,500.00 download icon 1

Reconstruction of energy sources and distribution network in Hospital and Health centre

The project has installed new decentralized heat sources based on hot water and new valves and thermostatic heads on the local heaters. It has also replaced an old steam heat in the central ventilation system of the Hospital and Health Centre Dunajská Streda.
800,000.00 718 3,577.3 40,618.86 download icon 1

Replacement of heat sources in Košice-Šaca, Sečovce and Bratislava

The project has improved the heat production system in Residential house and Hydro-meliorations office/research facility by replacing old natural gas boilers. This project has lead to the improvement of the buildings energy performance as well as to the maintenance costs reduction.

266,000.00 239 215.10 18,640.16 download icon 1

Improvement of a residential building in Dubnica nad Váhom

The project has improved exterior wall insulation, basement ceiling insulation and the insulation of the ceiling of the top floor.
114,000.00 18 92.03 17,100.00 download icon 1

Improvement of a residential building in Trenčín

The project has improved exterior wall insulation, basement ceiling insulation and it has also replaced original steel windows.

94,920.19 13 66.18 14,238.03 download icon 1

Improvement of a residential building in Nemšová

The project has improved exterior wall insulation, basement ceiling insulation, it has also replaced original wood windows and the heating system has been balanced.
69,726.52 14 68.09 10,458.98 download icon 1

Improvement of a residential building in Dubnica nad Váhom

The project has improved exterior wall insulation, ceiling insulation, it has also replaced original entrance door and the heating system has been balanced.

90,000.00 14 76.62 13,500.00 download icon 1

Improvement of a residential building in Liptovský Mikuláš

The project has improved exterior wall insulation, basement ceiling insulation, roof insulation, it has also replaced original wood windows and the heating system has been balanced.
45,000.00 9 34.27 6,750.00 download icon 1

Improvement of a residential building in Spišská Belá

The project has improved exterior wall insulation and basement ceiling insulation.

59,999.98 22 111.23 9,000.00 download icon 1

Improvement of a residential building in Banská Bystrica

The project has improved exterior wall insulation, ceiling insulation, basement ceiling insulation, roof insulation, it has also replaced original doors and windows and a new heating system has been installed.
500,000.00 122 450.29 75,000.00 download icon 1

Improvement of a residential building in Očová

The project has improved exterior wall insulation, ceiling insulation, it has also replaced stairway windows and entrance doors and the heating system has been adjusted, including the installation of thermostatic valves.

100,000.00 19 71.41 15,000.00 download icon 1

Improvement of a residential building in Pivovarská, Ružomberok

The project has improved exterior wall insulation, flat roof thermal insulation, basement ceiling thermal insulation and the heating system has been adjusted.

100,000.00 17 64.95 15,000.00 download icon 1

Improvement of a residential building at Lesná street in Ružomberok

The project has improved exterior wall insulation, flat roof thermal insulation, basement ceiling thermal insulation and the heating system has been adjusted.

200,000.00 35 126.37 30,000.00 download icon 1

Improvement of a residential building in Jablonica

The project has improved exterior wall insulation, ceiling insulation, it has also replaced original wood and metal windows and doors and the heating system has been adjusted.

81,480.00 10 52.53 12,222.00 download icon 1

Improvement of a residential building at Scota Viatora

The project has improved exterior wall insulation, ceiling insulation, it has also improved top ceiling thermal insulation and replaced windows in common premises.

101,690.00 7 64.80 15,253.50 download icon 1

Reconstruction of public lighting in five municipalities in southern Slovakia

The project  has reconstructed the entire public lighting, excluding column and wiring, in each municipality.

93,938.19 24 89.54 4,696.91 download icon 1

Refurbishment of a compressor station in SLOVMAG, a.s. (Inc.)

The project  has installed a new compressor station with higher air production efficiency and a better control flexibility regarding the specific operation requirements in SLOVMAG, a.s. (Inc.).

104,274.00 52 178.54 5,213.70 download icon 1

Reconstruction of heat source for multifunctional building in Vysoké Tatry

The project has replaced the old natural gas boilers with heat pump (air/water technology) and new condensing boilers (as peak energy source) in the multifunctional object situated in Vysoke Tatry – Starý Smokovec.

149,606.00 25 139.10 7,480.30 download icon 1

EPC projects of lighting in three companies in western Slovakia

The project has replaced lighting with new LED technology in the production areas of the following companies: Strümsfs s.r.o., Kerkosand spol. s.r.o. and COOP VOZ, a.s.

117,479.76 35 124.99 5,873.99 download icon 1

Improvement of residential buildings in Vlachy

The project has improved exterior wall insulation, roof thermal insulation, exchanged glazed steel staircase and it has replaced the original steel windows.

59,000.00 3 17,097.00 8,850.00 download icon 1

Improvement of residential buildings in Jablonica

The project has improved basement ceiling insulation, exterior wall insulation, roof insulation, it has also replace the original windows and doors with double or triple glazing and the heating system has been adjusted.

128,853.09 13 67.43 19,327.96 download icon 1

Improvement of residential buildings in Ružomberok

The project has improved basement ceiling insulation, exterior wall insulation, ceiling below the attic insulation and roof cover replacement, it has also replace the stairway glazed wall, replace and insulate the DHW pipelines and the heating system has been refurbished completely.

101,634.00 1 43.32 15,245.10 download icon 1

Reconstruction of public lighting in Veľký Kýr.

The project has replaced lighting with new LED technology in Veľký Kýr.

116,473.95 20 69.89 5,823.70 download icon 1

Reconstruction of public lighting in Bernolákovo

The project has replaced lighting with new LED technology in Bernolákovo.

229,290.00 78 268.23 11,464.50 download icon 1

EPC projects in the Elementary school in Drotárska street (Bratislava) and in the Community centre Dunajská Streda

The project has replaced the old gas boilers with new condensing boilers, some lamps and windows in the Elementary school in Drotárska street (Bratislava) and the old gas boilers with new condensing boilers in the Community Centre Dunajská Streda.

415,000.00 131 652.90 20,750.00 download icon 1

Decentralization of the heating system and replacement of DHW preparation equipment in the complex of Žilinská Regionálna Železnica (ZRZ)

The project has decentralized the heat source and the supply system within the complex of Žilinská Regionálna Železnica (ZRZ) as well as replaced the DHW preparation technology (primary energy / fuel).

252,000.00 83 363.27 12,600.00 download icon 1

Improvement of a residential building in Vihorlatská č.12 (Bratislava)

The project has improved exterior wall insulation and the insulation of the flat roof and the basement ceiling. The windows has been replaced and the heating system has been balanced.

60,000.00 12 54.43 9,000.00 download icon 1

Improvement of a residential building in Liptovský Peter č.254

The project has improved exterior wall insulation and the insulation of the flat roof and the basement ceiling. The windows has been replaced and the heating system has been balanced.

82,273.80 8 40.01 12,341.07 download icon 1

Improvement of a residential building in Horný rad 541

The project has improved exterior wall insulation and the insulation of the flat roof. The windows and the entrance door has been replaced and the heating system has been balanced.

60,193.88 3 41.23 9,029.08 download icon 1

Improvement of a residential building in BD Športová 1547/1

The project has improved exterior wall insulation, basement ceiling insulation, flat roof insulation, it has replaced the original iron windows and has also balanced the heating system.

126,520.47 1 61.64 18,978.07 download icon 1

Improvement of a residential building in Róberta Dúbravca 1514/1

The project has improved exterior wall insulation, basement ceiling insulation, flat roof insulation and ceiling of unheated attic insulation. It has also replace the original doors.

121,240.80 21 77.09 18,186.12 download icon 1

Improvement of a residential building in Tatranská cesta 164/56

The project has improved exterior wall insulation and the insulation of flat roof and the windows has been replaced.

77,005.00 1 48.44 11,550.75 download icon 1

Improvement of a residential building in Liptovský Peter č.255

The project has improved basement ceiling insulation, exterior wall insulation, insulation of basement ceiling, insulation of flat roof and the heating system has been adjusted.

63,336.49 8 38.90 9,500.47 download icon 1

Improvement of a residential building in Liptovský Peter č.253

The project has improved basement ceiling insulation, exterior wall insulation, Insulation of ceiling below non-heated attic and the heating system has been adjusted.

95,056.80 8 39.44 14,258.52 download icon 1

Improvement of a residential building in Lesná č. 15,16,17

The project has improved basement ceiling insulation, exterior wall insulation, and the heating system has been adjusted

199,988.00 21 96.67 29,998.20
download icon 1

EPC projects of public lighting in nine municipalities in southern Slovakia

The project  has reconstructed the public lighting in the following municipalities: Nenince, Trebušovce, Sečianky, Husiná, Vlkas, Chrastince, Belá, Čajkov, Ondrejovce

112,195.04 39 145.85 5,609.75 download icon 1

Replacement of the heat sources to improve heat production systems in particular buildings; replacement of doors and windows of the canteen building

The project has improved the heat production system in 5 buildings. The school canteen building had been also equipped with new doors and windows

292,000.00 15 293.94 14,600.00 download icon 1

Improvement of a residential building in Ibrányiho

The project has improved insulation and balanced heating system in residential buildings in Ibrányiho

541,850.00 48 243.96 81,277.50 download icon 1

Improvement of an industrial building in Trstená town

The project has retrofitted boiler houses and distribution network in Trestená

721,872.30 295 1,331.55 36,093.62
download icon 1

Improvement of a residential building in Banská Bystrica

The project has improved insulation and replaced entrance and balcony doors in the apartment in Banská Bystrica

200,000.00 32 145.02 30,000.00 download icon 1

Improvement of a residential building in Spišská Nová Ves

The project has improved insulation in a residential building in Spišská Nová Ves

75,000.00 11 59.43 11,250.00 download icon 1

Improvement of an industrial building in NISSENS Slovakia, s.r.o.

The project has consisted of reconstruction of lightning in the production area of NISSENS Slovakia, s.r.o.

315,484.80 273 932.91 15,774.24 download icon 1

Improvement of school and industrial buildings in Cvernovka

The project has replaced heat sources in elementary school and kindergarten buildings in Nemecka and Cvernovka Yarn Factory in Bratislava

221,200.00 48 244.19 11,060.00
download icon 1

Replacement of the lighting system in RIBE Slovakia, k.s.

The project has reconstructed the lighting in the production area of RIBE Slovakia, k.s.

77,332.00 139 474.70 7,863.54 download icon 1

Improvement of a residential building in Liptovský Mikuláš

The project has improved insulation and balanced heating of apartment building in Liptovský Mikuláš

138,470.00 16 75.53 20,770.50 download icon 1

Improvement of residential building in Banská Bystrica

Improvement of a residential building’s thermal properties and heating system

350,189.00 31 141.14 52,528.35 download icon 1

Improvement of residential building in Starohorská

Improvement of residential building’s thermal properties of walls, roof and windows and the modernization of the heating system

410,000.00 38 175.32 61,500.00
download icon 1

Replacement of hydraulic press

Replacement of hydraulic presses in the production of fireproof construction materials in SLOVMAG, a.s. (Inc.)

2,400,000.00 246 839.92 120,000.00 download icon 1

Refurbishment of a mine compressor station

The project focuses on the refurbishment of the compressor station for compressed air production

148,622.00 57 197.25 7,431.10 download icon 1

Reconstruction of residential house

Insulation improvement, replacement of original windows and the installation of a new heating system in residential building

98,149.30 1 55.50 14,722.40 download icon 1

Improvement of residential building in Bánovce nad Bebravou

Improvement of residential building in Bánovce nad Bebravou obtaining a reduction in heat consumption through improvements in thermal insulation

285,000.00 47 214.37 42,750.00
download icon 1

Residential building improvement in Nitra

Complete thermal insulation improvement in a residential building in Nitra

360,000.00 27 121.71 54,000.00 download icon 1

Residential building improvement in Ružomberok

Insulation improvement and replacement of windows in a residential building in Ružomberok

107,000.00 1 42.53 16,050.00 download icon 1

Reconstruction of lighting in 4 Slovak villages

The project has consisted in the reconstruction of the lighting system in the villages of Rudna, Družstevná pri Hornáde, Mestisko and Vyškovce with new LED technology

135,774.93 8 35.68 6,788.75 download icon 1

Reconstruction of public lighting in the municipality of Trebatice

The project has consisted reconstruction of the public lighting in Trebatice village, situated in the western part of Slovakia, with an LED lighting system

57,143.87 8 28.05 2,857.19
download icon 1

Optimization of central heating system in Kanianka

The project has consisted of an increase in the utilization of biomass for the central heating system in Kanianka

239,987.00 515 465.07 29,134.42 download icon 1

New heat source for the University Hospital in Skalica

New heat source (natural gas boiler room), shutdown of underground heat delivery pipes and partial reconstruction of the distribution network

400,000.00 103 516.00 20,000.00
download icon 1

Improvement of residential building in Banská Bystrica

Improvement of exterior wall insulation, floor in the non-heated attic insulation and insulation of basement ceiling in residential building in Banská Bystrica

130,000.00 19 49.23 19,500.00 download icon 1

Reconstruction of public lighting in four municipalities

Reconstruction of public lighting in the following municipalities: Čavoj, Podlužany, Rimavské Zalužany and Záhorce

65,576.97 14 55.92 3,278.85 download icon 1

Boiler room and central heating system modernization in Christ Church Secondary School in Trebišov and a kindergarten and elementary school in Vinné

Replacement the outdoor and underground hot water pipelines and modernization of the heat source and the equithermal regulation of the secondary systems

385,000.00 68 345.58 19,250.00 download icon 1

Improvement of residential buildings in Hnilčík

Complete thermal insulation improvement of residential building Slobodáreň 127 in Hnilčík

130,000.00 22 131.45 19,500.00
download icon 1

Improvement of a residential building in Rožňava

The project has improved basement ceiling, exterior wall and flat roof insulation in the residential building located in Rožňava

500,000.00 15 95.37 75,000.00 download icon 1

Improvement of a residential building in Liptovský Mikuláš

The project has improved ceiling above the non-heated floor, exterior wall and roof insulation as well as balancing the heating system

166,000.00 19

107.40

24,900.00
download icon 1

Improvement of a residential building in Liptovský Mikuláš

This project has improved external wall and ceiling over basement insulation and balanced the heating system which included the installation of a hot water heating system in the residential building.

209,460.00 22 26.50 31,419.00 download icon 1

Improvement of a residential building in Rožňava

The project has improved basement ceiling, external wall and roof insulation, replaced the original staircases and windows and balanced the heating system in the residential building.

174 000.00
7 67.28 26,100.00 download icon 1

Improvement of a residential building in Ružomberok

This project has improved exterior wall, basement ceiling and unheated attic insulation and replaced original wooden windows with insulating double glazed windows.

105,000.00 20 98.10 15,750.00 download icon 1

Improvement of public lighting in eight Slovak municipalities

The project has improved public lighting systems by replacing compact lamps with LED lights in eight municipalities in Slovakia.

86,817.04 20 76.39 4,340.85
download icon 1

Improvement of a industrial buildings in Čierna nad Tisou, Michalovce and Poprad

This project has replaced boilers in Slovak railway buildings in three different municipalities to improve energy efficiency of heat supply.

1,174,154.00 343 1,725.97 58,707.70 download icon 1

Residential building improvement in Dubnica nad Váhom

The project has improved the external wall insulation with polystyrene and mineral wool, replaced the original basement wooden windows with plastic double glazed insulating windows and balanced the heating system at the residential building located at Pod Hájom 1083, Dubnica nad Váhom.

150,170.00
24 39.68 22,525.50 download icon 1

Improvement of a residential building in Zvolen

The project has improved exterior wall insulation as well as the insulation of ceiling below non-heated attic using mineral wool slabs in the residential building located at Sokolská 1508/20,22, 960 01 Zvolen.

165,000.00 20 115.40 24,750.00 download icon 1

Improvement of a residential building in Školská 9,11, Levice

This project has improved external wall and ceiling over the basement insulation with mineral wool, improvement of roof thermal insulation with bead wave and balanced the heating system.

208,550.00 15 23.08 31,282.50
download icon 1

Improvement of a residential building in Za sokolovňou 5

The project has improved exterior wall insulation using polystyrene slabs and improved the insulation of the ceilings above exterior environment using mineral wool slabs.

200,000.00 25 63.53 30,000.00 download icon 1

Improvement of a residential building in Slovenská Ľupča

This project improved insulation in exterior wall, basement ceiling and ceiling below attic using mineral wool and cement polystyrene slabs, as well as hydraulically adjusted the heating system in the residential building located at 1 . Mája č.13, 15, Slovenská Ľupča.

110,000.00 19 96.44 16,500.00
download icon 1

Improvement of a residential building in Hnúšťa

The project has improved insulation of exterior wall, basement ceiling and flat roof using MW and EPS slabs as well as replacement of original windows in the residential building in Nábrežie Rimavy 450, Hnúšťa.

207,216.00 2 99.01 31,082.00 download icon 1

Improvement of a residential building in Ružomberok

The project has improved exterior wall and entrance lobby ceiling insulation using mineral wool slabs, replaced stairway window openings and insulation of new windows to have plastic frames and double insulated glass and hydraulically adjusted the heating system including the insulation of thermo-control heads in the residential building at Tatranská cesta 162/52, 034 01 Ružomberok.

90,384.00
1 40.99 13,557.67 download icon 1

Replacement of wood timber handling machine in Most pri Bratislave

The project replaced the old diesel wood timber handler with a new electric machine (Sennebogen 830 E-series) for the industrial mill logistic service company LOG systems, s.r.o. located in Most pri Bratislave.

265,000.00 65 335.89 13,250.00 download icon 1

Replacement of old buses and trolleybuses with new battery-equipped trolleybuses in Banská Bystrica

The project has replaced two old buses and two old trolley buses with new battery-equipped “partial” trolley buses in Banská Bystrica.

700,000.00 153 662.12 35,000.00
download icon 1

Replacement of technology in boiler house in Lučenec - Opatová

The project has installed a new heat source, a boiler house, for the industrial building located at Štefana Moyzesa 47, 984 01 Lučenec.

230,000.00 91 455.68 11,500.00 download icon 1

Improvement of a residential building in Dubnica Nad Váhom

The project has improved the insulation of the residential building in the external wall, basement ceiling and ceiling of the top floor.

139,940.00 18 92.22 20,991.00 download icon 1

Improvement of a residential building in Breznov

This project improved insulation of exterior and interior walls, attic and lobbies, it also reconstructed loggias instead of dangerous balconies, replaced entrance doors with new thermal bridge and insulation glass types and hydraulically adjusted the heating system.

400,000.00 30 49.32 60,000.00
download icon 1

Improvement of a residential building in Banská Bystrica

The project has improved exterior wall and basement insulation and replaced glass concrete stairway windows with plastic framed and insulated double glass windows.

60,000.00 7 59.58 9,000.00

download icon 1

 

Improvement of a residential building in Dubnica Nad Váhom

The project has improved external walls insulation, it has replaced original front doors and it has also balanced the heating system, improving energy efficiency in the building.

148,000.00 13 32.64 22,200.00
download icon 1

Replacement of the lighting system in Mywood Polomka Timber, s.r.o.

The project made a reconstruction of the production hall and replaced the lighting system in the production halls F and G, improving energy efficiency.

80,000.00 93 319.51 4,864.00

download icon 1

 

Replacement of interior lighting in Železiarne Podbrezová, a.s.

The project focuses on the replacement of the original lights in Tube rolling mill / hall num. 3 in Železiarne Podbrezová a.s. (Inc.). A new LED lighting system with intelligent control was installed in the facility.

170,000.00 159 545.00 8,994.98
download icon 1

Replacement of interior and exterior lighting in PREFA Invest a.s.

The project focuses on the replacement of the original lights in the PREFA Invest a.s. (Inc.) company with new units using LED technology, making energy savings and GHG emissions reductions.

74,708.00 47 163.08 3,735.42

download icon 1

 

Reconstruction of building in Žilina including a new heat source

The project made improvement in an industrial building; reconstruction of the building, thermal insulation and windows, reconstruction of the heat exchanger station including the new heating system, and installation of new sources for cooling, including the new cooling system.

3,162,700.00 608 1,867.20 158,135.00
download icon 1

Replacement of lighting systems with new LED technology in Stročín

The project has replaced the lighting system in Stročín. The reconstruction of the lighting systems reduced the consumption of electricity and improved light condition. 

24,000.00 5 17.72 1,200.00

download icon 1

 

Modernisation of industrial lighting in a production hall of GOHR, s.r.o.

The project made the reconstruction and modernisation of industrial of industrial lighting in a production hall (assembly facility) of GOHR, s.r.o.(Ltd.). The project has installed modern and certified LED lamps, including the option of controlling the total input power by natural light intensity.

177,000.00 84 289.35 8,850.00
download icon 1

Replacement of old gas boilers with new condensing boilers

The project has replaced old gas boilers with new condensing boilers in elementary school Veľký Biel and administrative building AirExplore, and the installation of a new condensing boiler in the Pri Starej Prachárni block of flats.

291,445.00 57 223.80 14,572.25

download icon 1

 

TOTAL

38,570,094.79

14,450 58,368.27    2,962,431.71